Multi-Site Industrial Rollout Management

Distribution centers, warehouses, light manufacturing, and facility upgrades are the same problem as a store rollout at scale, with dozens of sites and vendors and deadlines that all have to hold. RolloutIQ™ runs the whole industrial rollout program from deal to closeout, so every site stays on schedule and on budget.

Industrial & Facilities

The Challenge

Why Industrial Rollouts Slip in Spreadsheets

Long-Lead Equipment Sets the Critical Path

Switchgear, transformers, HVAC, and racking carry long lead times that quietly drive the schedule. Miss the order date on one site and the whole opening moves, often before anyone notices.

Many Sites, One Stretched Team

A team standing up dozens of facilities at once cannot hold every schedule, permit, and vendor in a spreadsheet without losing the thread on at least one of them.

Permits, Utilities, and Inspections by Jurisdiction

Every location has its own permits, utility interconnections, and inspections. Tracking them per site over email is how a facility misses its energize or occupancy date.

Knowledge Walks Out the Door

When a project manager leaves, the real status of their sites leaves too, unless the record lives in a system instead of a shared drive and an inbox.

Platform Features

One System for Multi-Site Industrial Construction

RolloutIQ™ gives industrial and facilities teams the same portfolio control multi-site retail operators use, mapped to the way industrial programs actually run.

One Portfolio View of Every Site

See every facility through site selection, design, construction, and closeout in a single view, so the at-risk site is visible before it costs a go-live date.

Critical-Path Schedule Per Site

Run a real critical-path schedule on each project with dependency math and ripple recalculation, so a slip on one trade shows the new completion date immediately.

Long-Lead Procurement, Tracked to the Order Date

Run competitive sourcing and keep long-lead equipment on the schedule as its own milestone, so the order goes out in time to hold the opening.

Governed Budget and Change Control

Versioned budget baselines, routed approvals, and priced change captured from every vendor stream, so cost surprises surface while there is still room to act.

Versioned Drawings and Documents

Hold each site's drawing set as a versioned, per-sheet library so the field always builds from the current sheet, not a stale PDF in someone's inbox.

One Vendor and Contractor Directory

Reuse one directory of general contractors, subs, and equipment vendors across every site, and level their bids side by side in Sourcing before you award the next contract.

Single Source of Truth

One source of truth for your Industrial & Facilities portfolio

As your Industrial & Facilities footprint grows across sites, the same store ends up spread across separate spreadsheets and point tools, and the numbers drift apart. RolloutIQ™ keeps one durable record per store from the first deal through opening day, so your Industrial & Facilities rollout runs on one set of numbers every team can trust across the whole multi-site portfolio.

See how RolloutIQ™ is the single source of truth

Inside the Platform

See Your Rollout in One Place

The same RolloutIQ™ system of record that runs the whole program, from deal to grand opening across every store.

RolloutIQ™ portfolio map of facility locations across regions
RolloutIQ™ projects list in a Gantt timeline across the whole portfolio
RolloutIQ™ critical-path schedule with dependencies and status

By the numbers

Public figures from company filings, trade associations, research firms and federal data on how this industry is building, and none of them are RolloutIQ™ results.

259,381

public EV charging ports in the US

US DOE Alternative Fuels Data Center, 2026

77,037

of those ports are public DC fast chargers

US DOE Alternative Fuels Data Center, 2026

$161.5B

annual rate of US private spending on power construction in July 2026, up 6.5%

US Census Bureau, 2026

$755.2B

annual rate for all US private nonresidential construction in July 2026

US Census Bureau, 2026

FAQ

Common questions

RolloutIQ™ runs industrial rollouts such as distribution centers, warehouses, and light manufacturing the way retailers run store programs. Each facility is a location with its own projects. A project carries a critical-path schedule, drawings, a punch list, and an approved budget that tracks the baseline and change orders, with invoices and payments left in your ERP. The whole program rolls up into one portfolio.

Put the order date on each facility's RolloutIQ™ schedule as a deliverable that energization depends on, with the lead time as its duration, so when the order date moves, the go-live date moves with it. Grid equipment lead times run long, and Wood Mackenzie put switchgear at an average of 44 weeks in Q2 2025. Sourcing in RolloutIQ runs the bids and the award, and the purchase order itself goes out from your procurement system.

An EV charging program runs in RolloutIQ™ as one project per site, started from a charger template that holds the utility interconnection application, make-ready work, energization, and commissioning as deliverables. Your charging network provider runs the network software and billing, uptime monitoring included. Sites stuck waiting on the utility show as behind schedule in the project list, and charger installers join the projects they work on through a company role.

Smartsheet is the one schedule source RolloutIQ™ connects to today, and that link only reads, with the synced schedule held read-only in RolloutIQ. A facilities team coming from P6 can rebuild its standard site sequence once as a schedule template and apply it to each new facility. The engine works in calendar days without resource leveling, which matters if your schedulers depend on working-day calendars.

Each facility's drawing set uploads to RolloutIQ™ as a PDF of up to 500 MB, gets split into sheets read from the title block, and publishes as a numbered set. When the architect reissues a sheet, the new version supersedes the old one under the same number, and the contractors on that project see the current sheet. Hand-marked scans with an unreadable title block land in a worklist for a project admin to tag.